[Construction - Section 70]
Building approval
The construction is the transition from the construction phase in the use of the building.
A distinction is that public legal construction. When the supervision authority compliance with the building codes in building and construction aspects. And between the civil construction it is the transfer of risk from the contractors to client is a prerequisite for this is the completion and (mainly) the lack of freedom of the building or construction services performance
Public Legal approbation were in the wake of several Construction Rules law amendment
in many states reduced. For the majority of the construction projects can be found only random checks.
During the civil construction are the many details of the agreements of the parties, including whether the Treaty agreed order, or the Basic Law alone.
The decline has oral or written request of the contractor, so the entrepreneur within a Treaty in the order specified period. The first condition is the widespread and essentially faults completion of the work. With the decrease is the claim of authority to enforce an agreed contractual penalty lost, as far as he is not reserve this right.
Acceptance
The Decrease in the presence of the contractor and client (Owner), which also means the acceptance formally, or his representative (architect). By invitation, the decrease also within a period of two weeks. The formal acceptance is the only kind of decrease in the building already agreed, is in contrast to all other types decrease the deadline for acceptance exact placement (start of the warranty period). For reasons of evidence in general, a decrease protocol, and all the important points of the formal acceptance are cited inside.
For the respective rights and obligations of the individual countries is a detailed study is necessary.