Açılış Sayfası Yap | Sık Kullanılanlara Ekle | İletişim
ANASAYFA | HABERLER | ARAMA
Yapı Market
menu BATARYA VE ARMATÜR
menu Banyo Bataryası
menu Duş Başlıkları
menu Evye Bataryası
menu Lavabo Bataryası
Toplu Mail

Banyo Bataryası

[Construction Section 21]

CERTIFICATION

Cheating in fire safety test assembly building but not limited to, replacement of materials and components by manufacturer, adding additional security measures to ensure that the Assembly the test. As an analogy, perhaps a 10 dollars product, it is possible to the 5 dollars for the product, only to the test, unknown to the laboratory. If the point is consumed or hidden in the exam, a postmortem examination may or may not be a surprise change in the examination of the installation by the manufacturers. Assuming that the test is successful, the product certification lab then issues a confidential audit report. The manufacturer is not required to test this with anyone. The products in the test passed, that a certification list, which describes the products that were tested, the application, and the minimum and maximum tolerances for all components. In the case of a fire to the top, for example, including the wall or soil type and thickness, the size of the opening, penetrating, their tolerances and the distance, the thickness or strength of the fire stop materials, insulation used, etc. Typically, there is also a drawing.


Certification listings are short. For example, observations and interpretations of the test results, when the largest power cable can penetrate that a cable fire stop cable penetration is inadmissible and would be a violation of code. If the biggest hole can fire stopped with a particular certification list, is 1 meter opening is not permitted and is both a building code and fire code violation. Bounding simply means that the security related products must be used within the tolerances of the certification list. If only because a product has a certain certification object that does not mean that we extrapolate from there. If a certification list is used, this serves as proof not only that the test was conducted properly and that the tested systems, but also that a follow-up agreement is in effect between the manufacturer or the sender and the certifier. This means that in addition to the original inspection, if the testing materials were produced, the certifiers is entitled and obligated to unannounced inspections of the manufacturing facility to ensure that what is produced and sold is always the same as what was originally tested.


In the event that irregularities are discovered here on the part of the manufacturer, such as substitutions of cheaper ingredients or components, which can be disabled list, and the manufacturer can remove all the logos of certifiers from product development literature, promotional material, packaging etc.. In such a case, logos would be removed to storage, as well as stocks of the products that are already in the distribution or on construction sites. There were cases of delisting. But sometimes it may be deliberate irregularities, which they, or an ingredient or component of a tested system can no longer acceptable quality. Part of bounding is therefore to ensure that the list used for a range of installation is indeed actively with the certifiers.

 

Sayfa 1 | Sayfa 2 | Sayfa 3

 
Online Posta
Priz ve Anahtar Grubu Priz ve Anahtar Grubu

PRİZ Prizler evlerde kullanılan, üzerindeki deliklere fiş geçirilen ve böylece elektriğin akmasını sağlayan aletlerdir. Prizler, genelde aynı elektriksel standartta olmayan fişleri redded...

İNŞAAT MALZEMELERİ İNŞAAT MALZEMELERİ

YAPI ve TADİLAT Bitmiş yapılar ihtiyaç halinde tadil edilirler. Bunun anlamı bir binanın yapısal ve teknik açıdan modernize edilmesi veya elden geçirilmesidir. Bu işler sırasında b...

Banyo Bataryası

Büyük resim için tıklayın

Banyo Bataryası Banyo Bataryası
menu PREFABRİK EV
menu FAYANS VE SERAMİK
menu İNŞAAT MALZEMELERİ
menu İZOLASYON
menu MOBİLYA
menu NALBUR VE HIRDAVAT
menu OTOMOBİL VE BİSİKLET
menu SIHHİ TESİSAT
menu SPOR
menu ISITMA VE HAVALANDIRMA
menu TELEFON
menu YER DÖŞEMELERİ
Toplu Mail
© Yapı Market 2008 - Arama Listesi - Site Haritası